Casing drilling is used in making water and thermal wells in broken overburden conditions.

Site investigation involves taking a sample of the rock to evaluate the site and its suitability for proposed development.

Drilled piles are good solution for soft ground conditions requiring piling before construction.

Drilled piles are good solution for soft ground conditions requiring piling before construction.

In Top Hammer long hole drilling the hole length is up to 40 m and the hole size up to 127 mm.

Horizontal drilling is used to lead water, sewage, or cable pipes under roads, rivers, and buildings.

Forepoling, also known as tube umbrella, is used to strengthen tunnel roof in broken rock conditions.

Underground mining and construction both require drilling to excavate and to support the rock.

Bench and production drilling applications are used in open pits and underground mines.

Anchoring is a method where walls with masses of overburden are anchored to the solid rock.